Jump to content

Landing gear BOLTS for RIVETS SERVICE BULLETIN ----the "BEFORE" picture


DavePilot

This is the side view of the fuselage BEFORE the landing gear "BOLTS FOR RIVETS" service bulletin was completed on our 2010 Piper Sport in summer of 2014. Note red paint -original- on top of the six fasteners that got replaced in the SB. three fasteners on each side of the threaded center seat belt bolt attach point, in two vertical rows of three fasteners each, a total of six fasteners replaced with shiny new stout brass colored bolts on each side of the fuselage. Grand total of 12 total new bolts per airplane for this part of the BOLTS FOR RIVETS SB. There are also MORE new BOLTS, replacing rivets, inside" the fuselage not visible here.


From the album:

PiperSportDK

· 70 images
  • 70 images
  • 0 comments
  • 1 image comment


Recommended Comments

There are no comments to display.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...